NEWS: Kurmuk advances grid stabilisation work as December gold sales approach
NEWS: Sanku’s $4 million Ethiopian premix factory sets December opening date
NEWS: EEA report flags $1.4 billion April backlog in bank foreign exchange
NEWS: Dodai closes $16 million funding round as Tokyo Gas joins
NEWS: Metehara targets 94% rise in sugar output after disrupted season
NEWS: Ethiopia sets 12-month initial limit for financial sandbox trials
NEWS: OVID targets 20% emissions cut across construction and real estate
NEWS: Awash Insurance profit rises 65% to Br1.84 billion before tax
NEWS: Bayer plans Ethiopian wheat trials as fertiliser subsidy reaches Br100 billion
NEWS: Ethiopia’s central bank joins Islamic climate finance alliance ahead of COP32
Construction & Mining

Ethiopia Identifies Three Potential Sites for Proposed 2,400MW Nuclear Plant

Oct 26, 2026
Ethiopia Identifies Three Potential Sites for Proposed 2,400MW Nuclear Plant

Key Takeaways

  • 2,400MW is the combined capacity proposed for Ethiopia’s first nuclear power plant.
  • Prime Minister Abiy Ahmed announced three potential sites during an Ethiopian Nuclear Energy Commission visit.
  • Two reactors are planned, each with 1,200MW capacity.
  • Site suitability checks and preparation of the selected location are next steps.
  • An agreement with the technology supplier is also planned.
  • The Commission previously signed a nuclear-development agreement with Russia’s Rosatom.
  • Abiy linked the programme to industrialisation, research and skilled workforce development.

Market Impact

The announcement concerns project preparation, with site confirmation and a supplier agreement still ahead.

Abiy presented reliable electricity as supporting manufacturing and technological development. Skills and research form part of the programme.

Key Numbers

  • 2,400MW — proposed capacity — planned generation scale.
  • 3 sites — potential locations — selection pending.
  • 1,200MW — each reactor — proposed unit capacity.

Business Signal

The nuclear proposal has reached site assessment, with further preparatory steps required.