NEWS: Kurmuk advances grid stabilisation work as December gold sales approach
NEWS: Sanku’s $4 million Ethiopian premix factory sets December opening date
NEWS: EEA report flags $1.4 billion April backlog in bank foreign exchange
NEWS: Dodai closes $16 million funding round as Tokyo Gas joins
NEWS: Metehara targets 94% rise in sugar output after disrupted season
NEWS: Ethiopia sets 12-month initial limit for financial sandbox trials
NEWS: OVID targets 20% emissions cut across construction and real estate
NEWS: Awash Insurance profit rises 65% to Br1.84 billion before tax
NEWS: Bayer plans Ethiopian wheat trials as fertiliser subsidy reaches Br100 billion
NEWS: Ethiopia’s central bank joins Islamic climate finance alliance ahead of COP32
Construction & Mining

Akobo reports 12kg October gold output, prepares deeper Segele mine plan

Nov 10, 2026
Akobo reports 12kg October gold output, prepares deeper Segele mine plan

Key takeaways

  • 12kg — Akobo reports October doré gold production at Segele, with processed ore averaging 11 grams per tonne.
  • 181kg — Cumulative doré output since start-up; the average processed grade is approximately 22 grams per tonne.
  • 1,100 tonnes — Processing stockpiles include about 800 tonnes of vertical-shaft development material.
  • December — An updated mine development plan is expected; operations could reach approximately 200 metres, subject to final design.

Why it matters

  • October’s lower grade reflected more development material and previously accumulated tailings, the company says.
  • Shaft development continued despite difficult ground conditions.
  • Visible gold at Gingibil remains an exploration observation; assays are needed to establish grade and economic significance.

What to watch

  • The December mine plan and Gingibil laboratory results.
  • Further assessment of the potentially mineralised area west of Segele.

Source: Akobo Minerals company announcement | 9 November 2026 |  Original report

Image: AI-generated editorial illustration.